Confirmed product specification



MANUFACTURING
Cosmetics Manufacturing
in Guangzhou
Yuanze connects approved cosmetic product specifications with production preparation, manufacturing, in-process quality control and finished-product review in Guangzhou.
PRODUCTION PREPARATION
Prepare the project.
Coordinate production.
Connect the agreed formula, packaging and review requirements before confirming the project’s production scope.

Component and artwork decisions
Project-specific review requirements
Agreed scope and preparation
PRODUCTION PROCESS
Seven connected stages.
One production path.














PRODUCTION STAGE
BULK PREPARATION
PRODUCTION STAGE
FILLING
PRODUCTION STAGE
CAPPING / SEALING
PRODUCTION STAGE
CODING
PRODUCTION STAGE
LABELING
PRODUCTION STAGE
SECONDARY PACKAGING
PRODUCTION STAGE
CARTON PACKING
PRODUCTION ENVIRONMENT
A factory read
as one continuous scene.
Clean zones, equipment areas, observation points and finished handling build a wider view of the production environment.





QUALITY INSIDE MANUFACTURING
Quality continues
on the production floor.
Production activity stays connected to the quality path through review points carried into the line and finished-product handling.
- First-piece review
- Filling and packaging consistency
- Coding and label confirmation
- Production sampling
- Finished-product review




PRODUCTION READINESS
Manufacturing begins
when the project is ready.
Development decisions become the practical production information required to prepare and execute the approved project direction.
- 01Product Brief
- 02Formula Direction
- 03Approved Sample
- 04Packaging Direction
- 05Quality Requirements
- 06Production Preparation
- 07Manufacturing Execution
PACKAGING & COMPLETION
From production line
to completed cartons.






Buyer questions
Before you request a quote
How long does production take?
Bulk production usually takes 15–45 days, counted from deposit received and sample approval.
When does production begin?
Formula and packaging samples are confirmed by the customer in writing; the order starts once the contract is signed and the deposit is received.
DISCUSS THE PRODUCTION PATH
Ready to Move
Toward Production?
Bring the approved product direction, packaging context and known quality requirements into the next manufacturing discussion.
PROJECT GUIDANCE
Link the factory review to your proposed product.
Use the published manufacturing information as a starting point for supplier review. Request the current certificate, issuing body, assessed entity, site and scope. Then ask how the proposed formula, component and production quantity fit the agreed manufacturing and quality plan.